Menu

Bromley By Bow

April 13, 2016

Bow

Aluminium Building Products is currently working with Higgins, supplying and installing our BBA approved  Architectural  Coping system at their  Bromley By Bow , Tower Hamlets Site. The remit is the design and build of 219 new homes on an East London heritage landmark at Three Mills, home to the world’s oldest tidal mill.

A key challenge of the development is the special consideration to the grade 2 listed house mill within the Three Mills conservation area. The new homes are being built with a Victorian warehouse aesthetic that reflects the areas industrial heritage.  This site is key to the ongoing regeneration of the Three Mills area and the wider regeneration around the Olympic Park.

ABP are about to start work on the 4th and final block that faces the river Lea , having so far completed the installation of approximately 300mtrs of coping.

Kernel Court . Walnut Tree Close . Guildford . Surrey . GU1 4UD . Tel: 01483 546 547 . email us >